Hilti, European Training Centre
BWP were appointed by Hilti to act as Contract Administrator and Cost Consultants with regards the design and administration of the fit-out of the European Training Centre in Trafford Park
The centre needed to provide both practical and theory training facilities and acoustic performance of the fit-out was therefore an essential part of design. The space also needed to be as flexible as possible and the use of dividing partitions and movable acoustic walls allowed the most efficient use of the centre.